FIRAS & BM Trada Accredited

Passive Fire Stopping Services

FIRAS and BM Trada Certified fire stopping installation, surveys and remedial works for commercial, residential and industrial buildings.
We help contractors, landlords, facilities managers and responsible persons maintain compartmentation, meet fire safety duties and protect lives through compliant passive fire protection works.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available
The Risks

Fire stopping failures put buildings, people and compliance at risk

Failed Compartmentation

Gaps around service penetrations can allow fire and smoke to spread between compartments, defeating the building's primary defence against fire spread.

Poor or Undocumented Installation

Unrecorded fire stopping works create problems during inspections, handovers and audits. Without evidence, compliance cannot be demonstrated.

Legal and Insurance Exposure

Building owners, landlords and responsible persons need evidence that fire protection measures are suitable and maintained. Missing records mean risk.
What we do

Our Fire Stopping Services

Fire Stopping Installation

Certified fire stopping installation for new builds, refurbishments and remedial works, sealed properly, documented in full and signed off without delay.

Fire Barriers

Cavity fire barriers, ceiling void barriers and concealed-space fire barriers, installed and evidenced to keep fire and smoke from running unchecked through your building.

Fire Compartmentation

Compartmentation surveys, remedial works and evidence packs that prove your building's compartment lines actually do their job, when it matters most.

Fire Curtains

Automatic fire and smoke curtains designed, installed and serviced to protect open-plan spaces, atria, lift lobbies and means of escape without spoiling the architecture.

Intumescent Coatings

Intumescent paint and structural steel fire protection, applied to the right thickness, evidenced with DFT readings and signed off ready for handover.

FRA Action

Turn your fire risk assessment actions into completed, evidenced works - compartmentation, fire stopping, fire doors and cavity barriers, all closed out properly.
Get a Fire Stopping Quote
Why It Matters

Why Fire Stopping is Essential

Fire stopping is a fundamental element of passive fire protection. It maintains the compartmentation of a building - the structural strategy that slows fire spread, protects escape routes, and creates the time needed for safe evacuation. Without effective fire stopping, even a well-designed building can lose its fire resistance at the very points where services pass through compartment walls and floors.
Maintains fire compartmentation
Slows spread of fire and smoke
Protects escape routes
Supports Building Regulations compliance
Helps duty holders meet fire safety obligations
Provides evidence for insurers, assessors and building control
WHO WE HELP

Fire Stopping for Commercial and Residential Buildings

Contractors

Fire stopping works for new builds, refurbishments and handover packages.

Landlords and Property Managers

Remedial fire stopping to support fire risk assessment actions.

Facilities Managers

Ongoing passive fire protection maintenance and compliance support.

Housing Associations and Block Managers

Compartmentation improvements across communal areas, risers and service cupboards.

Industrial and Commercial Sites

Fire stopping for warehouses, offices, schools, healthcare, retail and industrial buildings.

Government and Councils

Fire stopping works for new builds, refurbishments and handover packages.
Get a Fire Stopping Quote
Our Process

How We Deliver

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

UK Fire Stopping Contractor

Nationwide UK Passive Fire Protection Company

Midsummer Fire Protection has established a reputation as a leading passive fire protection company across the UK. Offering our passive fire protection solutions nationwide.

Our head office is based in Kettering, with strategic locations in:
London, Birmingham, Liverpool, and Leeds, meaning we can cover vast areas of the UK, within an hour or two from one of our offices.

Five hubs across England & Wales. Same-day response, FIRAS-certified installers.

Postcode or town name — we'll route you to the closest team.

FIRE STOPPING COMPLIANCE

Compliant Passive Fire Protection Works

Our fire stopping works are carried out in accordance with relevant legislation, standards and manufacturer guidance. We use tested systems appropriate to each penetration type and fire rating requirement, and we document everything to support your compliance obligations.
Passive fire protection
Fire compartmentation
Building Regulations
Regulatory Reform Fire Safety Order
Fire Safety Act
Fire risk assessment recommendations
Tested fire stopping systems
Installation evidence
Frequently ASked

Fire Stopping FAQs

Why is fire stopping important?

Fire stopping maintains the compartmentation of a building - the principle that contains fire and smoke to their area of origin. Without effective fire stopping, fire can spread rapidly through concealed routes, putting lives at risk and undermining escape strategies.

Who is responsible for fire stopping in a building?

Under the Regulatory Reform (Fire Safety) Order 2005 and the Fire Safety Act 2021, the responsible person or duty holder must ensure fire protection measures, including fire stopping, are suitable and maintained. This applies to building owners, landlords, managing agents and facilities managers.

Do I need a fire stopping survey?

If you are unsure about the condition of fire stopping in your building, a survey will identify breaches and produce a prioritised report of recommended remedial works. Surveys are particularly important after refurbishment, following a fire risk assessment, or when preparing for building safety compliance.

What areas usually need fire stopping?

Common areas include service risers, ceiling voids, floor penetrations, plant rooms, electrical cupboards, communal corridors and any location where cables, pipes or ducts pass through compartment walls or floors.

How much does fire stopping cost?

Costs depend on the scope, number of penetrations, access requirements and building type. We provide clear, itemised quotations based on a site survey or project review so you know exactly what is included.

Can you fix failed fire stopping from a fire risk assessment?

Yes. We regularly carry out remedial fire stopping works to address actions raised in fire risk assessments. We work through the prioritised action plan, complete the works and provide evidence for your compliance records.

What evidence do you provide after installation?

Every project receives photographic records of each sealed penetration, details of the products used, and installation documentation suitable for handover, audit and compliance purposes.

Is fire stopping required by law?

Fire stopping is a key part of meeting Building Regulations (Approved Document B) and fire safety legislation. The responsible person must ensure compartmentation is maintained, which includes ensuring fire stopping is in place and effective.

Do you work with landlords, contractors and facilities managers?

Yes. We work with main contractors, sub-contractors, landlords, housing associations, facilities managers, local authorities and private building owners across commercial and residential sectors.

Common Problems

Common Fire Stopping Problems We Fix

These are the issues we see most frequently across commercial and residential buildings. If any of these apply to your property, we can survey, scope and resolve them.
Unsealed cable penetrations
Gaps around pipework
Damaged or missing fire batt
Incorrect sealants
Open risers and service cupboards
Poor workmanship from previous contractors
Missing installation records
Breaches found during fire risk assessments
Get a Fire Stopping Quote
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-downarrow-right