












We review your scope, specification, drawings and programme requirements.
Detailed site survey to define scope, access, phasing and methodology.
FIRAS-certified operatives deliver works safely and to programme.
Full O&M packs, certificates, photographic records and completion sign-off.


























The team at Midsummer Fire Protection carries out passive fire protection work across Derby, installing fire barriers and fire stopping systems to suit the detail of the building and the requirements of the product used.
Where fire compartments are interrupted by penetrations, risers, voids or junctions between walls and floors, the right installation helps maintain the intended performance of the building’s fire strategy. That matters in fit-outs, refurbishments and other projects where existing construction needs careful remedial work.
We support clients looking for clear, reliable fire stopping in Derby, with work completed to align with test evidence and manufacturer guidance rather than guesswork. The aim is to leave each treated area properly sealed and easier to inspect in future.
We are also Derby’s trusted Intumescent Paint Contractor.





