












We review your scope, specification, drawings and programme requirements.
Detailed site survey to define scope, access, phasing and methodology.
FIRAS-certified operatives deliver works safely and to programme.
Full O&M packs, certificates, photographic records and completion sign-off.


























The team at Midsummer Fire Protection carries out passive fire protection work across Birmingham, with a focus on building details that can be overlooked until they matter. That includes fire stopping around penetrations, treatment of voids and protection of junctions where different parts of a structure meet.
Whether the project involves a refurbishment, remedial works or an installation on a live site, the aim is to restore or maintain compartment lines so the building performs as intended. That can involve walls, floors, ceiling voids and risers, depending on the layout and the fire strategy.
Our work is guided by the relevant test evidence and manufacturer instructions, with a practical approach to fitting and finishing. This helps ensure the passive fire protection measures installed in Birmingham are appropriate to the detail, the material and the surrounding construction.
We are also Birmingham's trusted Intumescent Paint Contractor.





