












We review your scope, specification, drawings and programme requirements.
Detailed site survey to define scope, access, phasing and methodology.
FIRAS-certified operatives deliver works safely and to programme.
Full O&M packs, certificates, photographic records and completion sign-off.


























Midsummer Fire Protection carries out passive fire protection work across Stoke-on-Trent, with attention on the concealed details that affect how a building performs in a fire. Fire stopping and compartmentation are often out of sight, but they are critical to maintaining the integrity of fire-resisting construction.
Our work can involve sealing penetrations, protecting voids and treating junctions where walls, floors and ceilings meet. In buildings with risers, shafts or other service routes, careful installation matters because these spaces can quickly become pathways for fire and smoke if they are left unprotected.
This type of work is relevant on new build schemes, refurbishment projects and remedial upgrades where existing protection needs improving. The aim is to place the right materials in the right locations and follow the building’s layout accurately.
We are also a trusted intumescent paint contractor in Stoke-on-Trent.





