FIRAS & BM Trada Accredited

Passive Fire Stopping in Stockport. Installed, Certified, Evidenced.

Midsummer Fire Protection provides fire stopping and passive fire protection services across Stockport, supporting commercial, residential and healthcare buildings across Greater Manchester. Our work helps protect compartmentation around refurbishment and fit-out work affecting risers, floors and service routes, with clear records for contractors, building owners and responsible persons.
Accredited fire stopping support for Stockport contractors and managing agents, with evidenced sealing of penetrations, risers, voids and compartment lines across Stockport.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available

1,000+

Fire stopping projects completed across the UK
Trusted

5 Star

Rated by our clients
Accredited

100%

Certified & Accredited Fire Stopping Delivery
Experienced

100+

Experienced & Qualified Engineers
Passive Fire Stopping Contractors in Stockport

Compartmentation that performs, wherever the building is in Stockport

Midsummer Fire Protection delivers fire stopping and related passive fire protection work across Stockport, helping to maintain compartmentation where buildings are most vulnerable. The focus is practical, compliant sealing around penetrations and structural openings — work suited to a wide range of property types and refurbishment needs.

Across Stockport, fire stopping needs to be installed carefully if compartment lines are to perform as intended. We work to tested systems and manufacturer guidance, ensuring barriers are formed correctly around openings, junctions, service risers, voids and other concealed spaces.

Whether the work forms part of a new project or a remedial package, we approach each job with the same aim: to restore or maintain effective compartmentation in a way that suits the building and the wider programme.
Passive fire stopping around service penetrations in a commercial building
Our Stockport Services

Full-scope passive fire protection in Stockport

Every service delivered to industry standards, with full documentation for building control sign-off.

Penetration Sealing

Service penetrations sealed to tested specifications with full photographic records and compliance documentation.

Fire Barriers

Cavity barriers, curtain wall firestopping, and void closures maintaining compartment integrity to BS 9999.

Compartmentation

Fire compartment walls, floor separations and protected routes ensuring regulatory compliance on every project.

Remedial Works

Existing Stockport building stock brought up to current fire safety standards with prioritised remediation schedules.

Surveys & Audits

Comprehensive surveys identifying breaches in passive fire protection, with photographic condition reports.

Intumescent Coatings

Structural steelwork protection and applied fire rating systems installed by certified operatives.
Get a Fire Stopping Quote
Why Midsummer in Stockport

Built on evidence, not promises

Every fire stopping project backed by evidence, audit results and third-party accreditation.

Third-Party Accredited

BM TRADA and FIRAS certified, independently audited, not just self-declared.

Digital Documentation

BM TRADA and FIRAS certified, independently audited, not just self-declared.

Live Environment Experts

Proven delivery in occupied hospitals, schools and commercial buildings with zero disruption.

<24 Hour Response

Rapid response capability for urgent works and fast-track programmes across Stockport.

Single Point of Contact

Dedicated project manager from enquiry to sign-off - no chasing, no delays.

Audited to the Highest Standards

Every project assessed to the highest industry standards, ensuring compliance and safety.
Send an Enquiry

Tell us about the project

Share the scope, programme dates and any current evidence pack. We'll come back with a costed proposal and method statement that holds up under scrutiny.
01
Same-day acknowledgement
An estimator confirms receipt and the next steps within working hours.
02
Scope review
We review your drawings, specification or evidence pack and flag anything missing.
03
Costed proposal
You receive a fixed proposal, programme and method statement built around the building.

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Contact Page

By continuing you consent to Midsummer Fire Protection processing your data to respond to your enquiry as per our privacy policy.

info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Our Process

How We Deliver in Stockport

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

Sectors WE HELP

Specialist fire stopping experience across Stockport sectors

Healthcare

NHS trusts, private hospitals, care homes

Education

Schools, universities, student accommodation

Commercial

Offices, retail, mixed-use towers

Residential & Council

Housing association frameworks and council remediation

Industrial

Warehouses, manufacturing, data centres

Heritage & Public

Listed buildings, government, transport
Get a Fire Stopping Quote
Our work in Stockport

Trusted on the projects that can't fail

Also in Stockport

One Stockport team,  every passive layer

Fire stopping rarely sits in isolation. Our Stockport team also delivers certified fire door and intumescent coating works, coordinated under one project manager, one evidence pack, one accountability line.
Fire Doors · Stockport

Certified fire door installation & inspection

FIRAS-accredited installation, BM TRADA Q-Mark inspection and remedial works — fully documented for the golden thread.
Intumescent Coatings · Stockport

Structural steel protection, on-site & off-site

Applied fire rating systems for structural steelwork, installed by certified operatives or pre-coated off-site at our Kettering facility for faster Stockport programmes.

Passive Fire Stopping in Stockport

Midsummer Fire Protection carries out passive fire protection work across Stockport, with installations completed in line with the relevant test evidence and manufacturer guidance. We focus on the areas where fire can move unnoticed, particularly around openings, service routes and the junctions between building elements.

That can include sealing penetrations, protecting voids and maintaining compartment lines around risers, floors, ceilings and structural interfaces. The aim is to keep fire-resisting construction performing as intended, rather than leaving weak points behind the finishes.

Our services suit new-build projects, refurbishment work and remedial fire stopping in occupied or existing premises. We also support compliance-led works, snagging close-out and practical site requirements where fire protection details need careful finishing.

We are also a trusted intumescent paint contractor in Stockport.


Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopeusersphone-handsetchevron-downarrow-rightcheckmark-circle