FIRAS & BM Trada Accredited

Off-Site Intumescent Coatings

Facility-applied intumescent coatings on structural steel, coated under controlled conditions, evidenced with DFT readings and delivered ready to erect.
We help fabricators, main contractors and developers take coatings off the critical path with off-site application that's faster, cleaner and easier to evidence.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available
The Risks

Coating steel on site costs you time

Weather and access delays

Site application is exposed to rain, cold and follow-on trades, all of which delay coatings and damage finished work.

Inconsistent film thickness

Site spraying around erected steel makes uniform DFT harder to achieve, increasing the risk of under-application.

Coatings on the critical path

Waiting for coatings around live trades pushes hand-over dates. Off-site application removes that bottleneck.
What we Apply

Off-site coatings across every type of fabricated steel

Facility-applied basecoat

Tested intumescent basecoat sprayed under controlled humidity and temperature.

Decorative topcoats

RAL-matched sealer and topcoats applied to architect specification.

Primary structural members

Beams, columns and trusses coated to 30, 60, 90 or 120 minute ratings.

Cellular and castellated sections

Full perimeter coverage on complex section profiles.

Steelwork packages for erection

Coated steel delivered to site sequenced for the erection programme.

Site touch-up coordination

On-site make-good after erection to keep the coating warranty intact.
Get an Off-Site Intumescent QuoteOff-site Intumescent by Midsummer Fire Protection
Why It Matters

Off-site application takes coatings off the critical path

Coating steel under controlled facility conditions delivers a more consistent finish, removes weather risk and lets erection start with protection already in place. It's faster, cleaner and easier to evidence than site application.
Faster overall programme
Consistent dry film thickness
Removes weather and access risk
Reduces site labour and access plant
Cleaner site with no overspray
Evidence pack ready before delivery
WHO WE HELP

An off-site intumescent coatings partner for the people running the steel package

Steel fabricators

Facility-applied coatings dovetailed into your fabrication programme.

Main contractors

Coated steel delivered ready to erect - no coatings on the critical path.

Developers

Coordinated off-site coatings programmes across multi-block schemes.

Industrial and warehouse builds

Large-span frames coated efficiently in the facility.

Logistics and delivery teams

Coated steel sequenced and packed for the erection programme.

Architects and engineers

Specification support and evidence-ready records from the shop.
Get an Off-Site Quote
Our Process

How We Deliver

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

UK Fire Stopping Contractor

Nationwide UK Passive Fire Protection Company

Midsummer Fire Protection has established a reputation as a leading passive fire protection company across the UK. Offering our passive fire protection solutions nationwide.

Our head office is based in Kettering, with strategic locations in:
London, Birmingham, Liverpool, and Leeds, meaning we can cover vast areas of the UK, within an hour or two from one of our offices.

Five hubs across England & Wales. Same-day response, FIRAS-certified installers.

Postcode or town name — we'll route you to the closest team.

Standards & Compliance

Facility intumescent coatings applied to standards that pass scrutiny

Off-site application is only better than site application if the evidence is there. We apply only third-party tested systems, work to the manufacturer's tested DFT charts, and we record DFT readings on every member before it leaves the shop.
Approved Document B
BS EN 13381-8
Yellow Book / ASFP guidance
Manufacturer DFT charts
Tested coating systems
Building Safety Act 2022
FIRAS certification
Golden Thread records
Frequently ASked

Off-Site Intumescent Coating FAQs

What is off-site intumescent coating?
It's the application of intumescent fire protection paint to structural steel under controlled shop conditions, before delivery to site. The steel arrives coated to its required fire rating and ready to erect.
Why apply coatings off-site instead of on-site?
Shop application is faster, more consistent and not exposed to weather, follow-on trades or access constraints. It typically removes coatings from the project's critical path.
What ratings can be achieved off-site?
We routinely apply shop coatings to deliver 30, 60, 90 and 120 minute fire resistance, depending on the steel section size and the project specification.
How is DFT measured and recorded?
We take dry film thickness readings using calibrated gauges across every protected member, recorded against the manufacturer's required thickness for that section and rating, before the steel leaves the shop.
What about damage during transit and erection?
Some touch-up is normal. We coordinate on-site make-good after erection so the coating warranty stays intact and every member ends up at the right DFT.
Can topcoats be applied off-site?
Yes — RAL-matched sealers and decorative topcoats are applied in the shop to architect specification, giving a higher quality finish than site spraying.
What evidence do you provide for sign-off?
A full pack including DFT readings, product data sheets, applicator certification, coating area schedules and photographic records — ready for Building Control and warranty sign-off.
Are your applicators certified?
Yes. Our applicators are third-party certified under FIRAS / TPCP schemes and trained on the specific coating systems we apply.
Advantages of Off-site Coatings

Why off-Site intumescent coating reduces risk

Facility-applied intumescent coatings remove the risks, delays and quality issues that come with painting steel on a live construction site. These are the advantages our clients see on every project.
Coatings off the critical path
Controlled temperature and humidity
Consistent DFT across every member
No weather delays or rain damage
No clash with follow-on trades
Faster overall site programme
Cleaner site with no overspray
Full evidence pack before delivery
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down