FIRAS & BM Trada Accredited

Intumescent Coatings

Intumescent paint and structural steel fire protection, applied to the right thickness, evidenced with DFT readings and signed off ready for handover.
We help main contractors, fabricators and developers protect exposed steelwork to 30, 60, 90 and 120 minute fire ratings, on-site or off-site.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available
The Risks

Unprotected steel can fail in minutes

Steel loses strength fast

Exposed structural steel begins to lose load-bearing capacity at around 550°C - temperatures a building fire reaches within minutes.

Under-applied coatings fail early

Coatings applied below the specified dry film thickness won't deliver the rating on the drawings, and that's only spotted after the fire.

No DFT evidence, no sign-off

Building Control and warranty providers want measured DFT readings and applicator certification. Without them, sign-off stalls.
What we do

Intumescent coatings across every type of steel

On-site intumescent application

Spray and brush application to erected steel frames in live build environments.

Off-site intumescent application

Factory-applied basecoat and topcoat to fabricated steel before delivery to site.

Structural beams and columns

Primary structural members protected to 30, 60, 90 or 120 minute ratings.

Exposed steel feature work

Decorative and exposed steel finished to architectural specification with topcoats.

Cellular and castellated beams

Coatings applied to complex section profiles with full perimeter coverage.

Touch-up and remedial works

Make-good and re-coating where coatings have been damaged by follow-on trades.
Get a Fire Stopping Quote
Why It Matters

Intumescent coatings are what keep the building standing

Intumescent coatings expand under fire to insulate structural steel and buy time - time to evacuate, time to fight the fire and time to stop progressive collapse. Get the thickness wrong and the rating disappears.
Maintains structural integrity in fire
Protects load paths and stability
Required by Approved Document B
Supports insurance and warranty sign-off
Covers exposed and concealed steel
Provides the evidence Building Control wants
WHO WE HELP

Intumescent coatings specialists working with the people who need the rating

Contractors

Coatings packages on commercial, residential and industrial frames.

Steel fabricators

Off-site shop-applied coatings before delivery to site.

Developers

Coordinated coatings programmes across multi-block schemes.

Industrial and warehouse builds

Large-span structural steel coated to the required ratings.

Refurbishment teams

Re-coating exposed steel during change-of-use and fit-out works.

Architects and engineers

Specification support, system selection and evidence-ready records.
Get a Fire Stopping Quote
Our Process

How We Deliver

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

UK Fire Stopping Contractor

Nationwide UK Passive Fire Protection Company

Midsummer Fire Protection has established a reputation as a leading passive fire protection company across the UK. Offering our passive fire protection solutions nationwide.

Our head office is based in Kettering, with strategic locations in:
London, Birmingham, Liverpool, and Leeds, meaning we can cover vast areas of the UK, within an hour or two from one of our offices.

Five hubs across England & Wales. Same-day response, FIRAS-certified installers.

Postcode or town name — we'll route you to the closest team.

Why It Matters

Intumescent coatings applied to standards that pass scrutiny

Intumescent coatings are only as good as the evidence behind them. We apply only third-party tested systems, work to the manufacturer's tested DFT charts, and we record DFT readings as we go.
Approved Document B
BS EN 13381-8
Yellow Book / ASFP guidance
Manufacturer DFT charts
Tested coating systems
Building Safety Act 2022
FIRAS certification
Golden Thread records
Frequently ASked

Intumescent Coating FAQs

What is an intumescent coating?

An intumescent coating is a paint-like product applied to structural steel that expands when exposed to fire, forming an insulating char that protects the steel from reaching its critical failure temperature.

What fire ratings can you achieve?

We routinely apply coatings to deliver 30, 60, 90 and 120 minute fire resistance, depending on the steel section size and the project specification.

Do you apply coatings on-site or off-site?

Both. Off-site shop application is faster and gives a more controlled finish; on-site application is used where steel is already erected or where damage needs to be made good.

How is coating thickness checked?

We take dry film thickness (DFT) readings using calibrated gauges across every protected member. Readings are recorded against the manufacturer's required thickness for that section and rating.

Do exposed steel members need a topcoat?

Yes — where steel is visible or exposed to weather, a sealer or topcoat is applied for both aesthetic and protective reasons. We can match RAL colours to architect specification.

Can damaged coatings be repaired?

Yes. We carry out make-good and re-coating works where intumescent paint has been damaged by follow-on trades, drilling, lifting or weather exposure.

What evidence do you provide for sign-off?

A full pack including DFT readings, product data sheets, applicator certification, coating area schedules and photographic records — ready for Building Control and warranty sign-off.

Are your applicators certified?

Yes. Our applicators are third-party certified under FIRAS / TPCP schemes and trained on the specific coating systems we apply.

What we fix

Coating problems we're called in to put right

These are the issues that come up again and again on inspection, usually because the wrong product was used, or the right product was applied too thin.
Coatings applied below specified DFT
Wrong product for the steel section
Damage from follow-on trades
Missing topcoat in exposed locations
No DFT readings recorded
Cracking or debonding from poor surface prep
Mixed products across the same frame
No applicator certification on file
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down