Fire stopping should be checked after any refurbishment, fit-out, plant upgrade or service alteration because even minor works can compromise compartmentation. For commercial property teams, the practical close-out task is simple: identify what changed, inspect every affected fire-resisting wall, floor, riser, shaft and ceiling void, record evidence, and complete remedial fire stopping before the space returns to normal use.
In busy London and UK commercial buildings, refurbishment risk is rarely dramatic at first glance. It is usually a new cable route through a riser, pipework installed through a compartment wall, a ceiling void disturbed during an office reconfiguration, a fire door replaced without checking the surrounding frame, or old fire stopping removed so contractors can access services. None of that means the project has failed — but it does mean fire stopping needs to be treated as part of refurbishment handover, not a snagging afterthought.
This guide explains what to check, who should be involved, what evidence to keep, and how to reduce the risk of hidden passive fire protection defects after commercial refurbishment work.
Passive fire protection relies on compartmentation: walls, floors, fire doors, cavity barriers and service seals working together to resist the spread of fire and smoke. Refurbishment activity often cuts through those systems. The risk is highest where contractors add, remove or adapt building services, because cables, pipes, ducts, trays and containment routes frequently pass through fire-resisting construction.
Common refurbishment activities that can affect fire stopping include:
The issue is not only the initial penetration. A compliant seal depends on the wall or floor type, aperture size, service type, insulation, supporting construction, product system and installation method. A generic filler or “making good” repair is not the same as tested fire stopping.
UK fire safety duties do not disappear during refurbishment. Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person must take general fire precautions and maintain measures provided for fire safety. That includes keeping fire-resisting construction and passive fire protection effective where they support the building’s fire strategy.
For design and building work, Approved Document B explains fire safety provisions for compartmentation, cavity barriers, protected routes and service penetrations. Higher-risk buildings also sit within the wider Building Safety Regulator regime, where accurate records and change control are increasingly important. The government’s golden thread guidance reinforces the need for reliable building information, not vague handover notes.
In plain English: if refurbishment work has affected fire-resisting elements, property teams should be able to show what changed, what was inspected, what was repaired, which products or systems were used, and who signed it off.
A useful post-refurbishment check should be structured. Walking the building and hoping obvious defects jump out is not enough. Use the project scope, drawings, contractor records and site access plan to target the areas most likely to have been disturbed.
Start with the as-built reality, not the original scope. Ask:
This matters because undocumented late-stage changes are where fire stopping defects often hide.
Check any wall or floor that forms part of a fire compartment, protected escape route, riser enclosure, stair core, plant room boundary or service shaft. Look for unsealed holes, damaged seals, missing labels, oversized apertures, unsupported services, mixed services passing through one opening, and seals that have been cut back then patched.
Particular attention should go to risers and ceiling voids. These areas are easy to miss because the finished office space may look complete while the passive fire protection above the ceiling line is incomplete.
A penetration can look “filled” without being correct. The check should consider:
This is where a specialist fire stopping site survey is usually more valuable than a general building walk-round.
Refurbishment often involves new finishes, access systems, frames, seals, closers or ironmongery. Fire door checks should include the door leaf, frame, gaps, intumescent and smoke seals, closer performance, glazing, signage, hinges, latches, threshold condition and any new access-control penetrations.
Do not treat the door in isolation. The wall around it also matters. A compliant door set installed in a compromised partition is still a problem.
Ceiling voids, raised floors, façade interfaces and service zones can allow unseen fire and smoke spread if cavity barriers are missing, displaced or cut around services. After refurbishment, confirm that barriers disturbed during the work have been reinstated and that new routes through concealed spaces have been sealed properly.
Fire stopping should not sit in a generic snagging list with paint touch-ups and door handles. It needs a clear defect schedule with location, photo, risk/priority, recommended remedial action, completion evidence and close-out status. If areas cannot be accessed before handover, record that limitation and schedule follow-up access.
Lightweight evidence is one of the biggest weaknesses in refurbishment close-out. “Fire stopping completed” is not enough. A useful evidence pack should help a building manager, responsible person, insurer, auditor or future contractor understand what was installed and where.
Keep records such as:
For a deeper breakdown, see our guide to fire stopping evidence packs for building managers.
Sign-off should be proportionate to the building, the works and the risk. On small, low-risk alterations, a competent contractor may provide installation evidence and close-out information. On larger commercial refurbishments, landlord works, multi-tenant buildings, healthcare, education, residential blocks or higher-risk buildings, independent inspection or a specialist passive fire protection survey is often the safer route.
The key point is competence. Fire stopping is not simply decorative making good. The person reviewing it must understand compartmentation, tested systems, service penetrations, installation quality and the building’s fire strategy.
Commission a survey when refurbishment has affected compartment lines, when several trades have worked in risers or service voids, when records are incomplete, when the building has multiple occupiers, when there are life-safety or insurance concerns, or when the property team needs evidence before practical completion.
Midsummer Fire Protection provides fire stopping, fire stopping installation and survey support for commercial properties across London and the UK. We can inspect affected areas, identify defects, complete remedial works and help build a clearer evidence trail for handover.
Not every minor cosmetic project needs a full survey, but any work that affects walls, floors, risers, shafts, services, fire doors, ceilings or escape routes should include a fire stopping check. The larger or more complex the building, the stronger the case for specialist inspection.
Responsibility depends on leases, contracts and project scope, but the building’s responsible person still needs confidence that fire precautions are maintained. Landlords and managing agents should require suitable evidence from tenant works and should verify areas that affect shared compartmentation, risers, escape routes or landlord systems.
Only if they are competent to install the correct tested system for the substrate and service type. Fire stopping is product- and system-specific. Guesswork, generic filler or undocumented patching creates risk.
Check all affected penetrations, risers, compartment walls, floors, protected routes, service cupboards, fire doors, ceiling voids and remedial records. Make sure defects are closed out with photographic evidence and clear location references.
Recheck after the refurbishment works are complete, after any follow-on trade changes, and whenever future service alterations are made. Fire stopping should also form part of periodic fire safety and compartmentation reviews for the building.