Direct answer: after any tenant fit-out, refurbishment or service alteration, commercial property teams should check whether existing fire stopping, cavity barriers and compartment lines have been disturbed, then record the findings and arrange competent remediation where needed. The key is not just repairing visible gaps; it is proving that the building’s passive fire protection still supports the fire strategy.
Tenant fit-outs are routine in offices, retail units, hospitality spaces, industrial buildings and mixed-use commercial property. New data cabling, mechanical services, partitions, risers, ceilings and access panels can all pass through fire-resisting elements. If those penetrations are not sealed correctly, fire and smoke can move far faster than the design intended.
For landlords, managing agents, principal contractors and facilities teams, the practical question is simple: what should be checked before a newly fitted-out space is handed over or occupied? This guide sets out a sensible UK-focused process for keeping fire stopping maintenance under control.
Most fit-out work involves change. Walls are opened, ceilings are removed, new containment is installed and service routes are adjusted. Even small changes can affect compartmentation if they cut through a wall, floor, shaft, riser or ceiling line that forms part of the fire strategy.
Common risk points include cable penetrations through compartment walls, pipework above suspended ceilings, poorly reinstated riser cupboards, unsealed gaps around ductwork, damaged collars or wraps, and historic fire stopping that is hidden until the fit-out exposes it. In some buildings the issue is not one major defect; it is dozens of small penetrations that have built up over multiple tenant changes.
Midsummer’s fire stopping services are designed around this reality: survey, identify, install, document and help the client maintain clear evidence of what has been done.
In England and Wales, the Regulatory Reform (Fire Safety) Order 2005 places duties on the responsible person to manage fire safety risks in relevant premises. GOV.UK’s guidance on making premises safe from fire is a useful starting point for understanding those responsibilities.
For higher-risk buildings and projects affected by the Building Safety Act regime, the record-keeping expectation is also sharper. The government’s Building Safety Regulator guidance explains the building control process for higher-risk buildings, while Approved Document B remains a key reference point for fire safety provisions under the Building Regulations.
The important point for commercial teams is this: passive fire protection should not be treated as a one-off installation item. It needs to be maintained whenever the building fabric or services change.
Start with the building’s fire strategy drawings, O&M information, existing fire stopping records and any fit-out drawings. The team needs to know which walls, floors, risers and shafts are intended to resist fire before deciding whether a penetration is a defect.
Where information is incomplete, a passive fire protection site survey can help establish what is visible, what has been altered and where intrusive checks may be needed.
The defects that matter most are often out of normal view. Fit-out teams may leave walls looking finished at low level while cable trays, pipework and ductwork above the ceiling pass through fire-resisting construction without suitable seals. Riser cupboards are another common weak point because they attract repeated service changes over time.
Checks should include whether the seal type suits the service and substrate, whether the opening has been overfilled or left unsupported, whether labels or records match the installation, and whether previous works have damaged nearby fire stopping.
Fire stopping can be compromised by trades who are not directly installing new services. Ceiling access, bracket fixing, core drilling, temporary cabling and late-stage changes can all create gaps. The handover inspection should therefore happen late enough to catch final alterations, not just early works.
Fit-outs can affect fire doors through replacement ironmongery, altered floor finishes, damaged frames, changed access control or decoration around intumescent seals. If the project includes fire door works, Midsummer’s fire door services can support inspection and remedial planning.
A good evidence pack should make the installation understandable to someone who was not on site. It should include location references, photographs before and after remediation, product information, installer details, dates, drawings or marked-up plans, and notes explaining any limitations or inaccessible areas.
This is where many projects fall down. A generic statement that “fire stopping has been completed” is not the same as a usable record. Property teams need evidence that supports future maintenance, future fit-outs and, where relevant, the golden thread of building information. For a deeper look at record keeping, see Midsummer’s guide to fire stopping evidence packs for building managers.
The biggest mistake is assuming that a finished-looking fit-out means compartmentation is intact. Another is relying on photographs without location references, which makes future verification difficult. Teams should also avoid mixing untested materials, sealing around services without considering movement or service type, and allowing multiple trades to open previously completed seals without a reinstatement process.
For landlords and managing agents, the better approach is to build passive fire protection checks into the fit-out approval, site inspection and handover process. That turns fire stopping from a last-minute snag into a managed compliance item.
Midsummer Fire Protection supports commercial clients with surveys, fire stopping installation, fire doors, intumescent coatings and passive fire protection works across London and the surrounding areas. If a tenant fit-out, refurbishment or services upgrade has changed your building, our team can help identify defects, complete remedial works and provide clear evidence for your records.
To discuss a project, arrange a survey or request support with fire stopping maintenance after refurbishment, contact Midsummer Fire Protection.
Yes, where the fit-out changes services, walls, ceilings, risers or compartment lines. Even minor service penetrations can affect fire and smoke spread if they are not sealed correctly.
Responsibility depends on the lease, works agreement and building management structure, but the responsible person must manage fire safety risks under the Fire Safety Order. Landlords, managing agents, tenants and contractors should make responsibilities clear before works start.
Keep location-based photographs, product details, installation dates, installer information, drawings or marked-up plans, and notes on inaccessible areas or follow-up actions.
Fire stopping should be designed, installed and recorded by competent people using suitable tested systems. General contractors may coordinate the works, but specialist passive fire protection input is usually the safer route for commercial projects.