Fire Stopping Evidence Packs: What Building Managers Should Keep on Record

By Midsummer Fire Protection

In This Article

Fire stopping evidence packs help building managers prove that compartmentation has been installed, checked and recorded properly. For commercial and residential buildings, that evidence should show what was installed, where it was installed, which system was used, who completed the work, and how future inspections can verify it.

As the industry moves toward better building safety records and the golden thread of information, passive fire protection is no longer just a site activity. It is part of the building record.

What is a fire stopping evidence pack?

A fire stopping evidence pack is a structured record of completed fire stopping works. It should help a responsible person, facilities manager, principal contractor or building owner understand the condition of fire compartmentation and the work carried out around service penetrations, risers, walls, floors, voids and structural junctions.

For Midsummer clients, this is closely linked to fire stopping, passive fire protection services and practical site records that can be reviewed long after the original installation team has left site.

Why evidence matters for compartmentation

Fire stopping protects compartment lines by sealing openings where services pass through fire-resisting walls and floors. Without reliable records, it becomes harder to confirm whether penetrations have been sealed using the correct tested system, whether later trades have damaged the seal, or whether further remedial work is required.

The Building Safety Regulator and the wider requirements of the Building Safety Act 2022 have pushed record-keeping higher up the agenda. Even where a building is outside the highest-risk regime, the direction of travel is clear: decisions, installations and safety-critical works need to be evidenced.

What should a good fire stopping evidence pack include?

A useful evidence pack should usually include:

  • location references for each penetration, riser, wall, floor or compartment line;
  • before and after photographs of the works;
  • details of the fire stopping system used, including product and installation references where applicable;
  • installer details, dates and sign-off notes;
  • drawings, marked-up plans or schedules linking evidence to the correct location;
  • inspection notes, defects, remedial actions and completion records.

Where intrusive or planned checks are needed, a fire stopping site survey can help identify gaps in existing records and prioritise areas where compartmentation may be most vulnerable.

Common gaps in fire stopping records

The biggest issue is usually not that no fire stopping exists. It is that the record is incomplete. Building managers often inherit partial photos, old O&M files, contractor emails, unlabelled drawings or no clear link between a photo and the exact location on site.

Other common problems include missing product references, no evidence of remedial works, no record of later service penetrations, and no clear schedule for reinspection after contractors have altered walls, ceilings or risers.

How Midsummer supports better fire stopping evidence

Midsummer Fire Protection helps contractors, building owners and property managers with certified passive fire protection works across London and the wider UK. Our team can support fire stopping installation, surveys and remedial works with clear evidence that helps maintain compartmentation and supports future review.

If you need fire stopping work completed, checked or evidenced, speak to Midsummer about fire stopping installation or contact the team to discuss your building.

FAQ: fire stopping evidence packs

Do fire stopping works need photographic evidence?

Photographic evidence is strongly recommended because it helps show what was sealed, where it was located and what the completed installation looked like before finishes, ceilings or access panels conceal the work.

Who should keep the fire stopping evidence pack?

The building owner, responsible person, managing agent or facilities team should retain the evidence as part of the building safety information. Contractors should also keep records for their own quality and handover processes.

Is an evidence pack the same as a fire risk assessment?

No. A fire risk assessment reviews fire safety risk and management arrangements. A fire stopping evidence pack is a technical record of passive fire protection works and compartmentation-related details.

When should fire stopping records be updated?

Records should be updated whenever fire stopping is installed, inspected, damaged, remediated or affected by new services passing through compartment walls or floors.

Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down