FIRAS & BM Trada Accredited

Fire Door Intumescent Seals

Supply, fit and replacement of fire door intumescent strips and smoke seals. Manufacturer-matched products, certified installers, full evidence on every door.
We restore the seals that make a fire door perform across communal corridors, flat entrances and commercial doorsets nationwide.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available
The Risks

Without working intumescent seals, the fire door doesn't perform

Painted-over intumescent strips

Repeated decoration coats the strips and stops them expanding when they need to. The door looks fine, but fails in the heat.

Missing or damaged smoke seals

Without smoke seals, cold smoke moves through the assembly long before the fire arrives, defeating the compartment.

Wrong product, wrong evidence

Generic seals fitted outside the door's test evidence collapse the certified performance of the assembly.
What we supply

Intumescent and smoke sealing across every fire door type

Intumescent strip replacement

Manufacturer-matched intumescent strips fitted to the door leaf or frame to test evidence.

Combined fire and smoke seals

Single-piece combined seals for assemblies requiring smoke control as well as fire resistance.

Brush and fin smoke seals

Drop-down smoke seals and brush seals across the leaf perimeter and threshold.

Glazing system seals

Intumescent glazing seals and gaskets within tested glazing systems.

Acoustic-rated sealing

Acoustic-rated seals on combined fire and acoustic doorsets.

Programme-wide reseal

Portfolio-scale resealing programmes across residential and commercial estates.
Get a Seal Quote
Why It Matters

Intumescent seals are the difference between a door and a fire door

Intumescent strips expand under heat to seal the perimeter gap. Smoke seals stop cold smoke moving through the assembly. Without both, working correctly, fitted to the door's test evidence, the assembly is not a fire door, regardless of what's stamped on the leaf.
Manufacturer-matched products
Fitted to test evidence
Combined intumescent and smoke options
Repaint-safe specification
Certified installers
Photographic evidence per door
WHO WE HELP

Intumescent sealing for the people responsible for keeping doors compliant

Housing providers

Reseal programmes across communal areas and flat entrance doors.

Facilities managers

Reactive and planned reseal across commercial portfolios.

Decorating contractors

Strip replacement after redecoration to restore lost performance.

Contractors

New-build sealing within complete certified door packages.

Industrial and Commercial Sites

Fire stopping for warehouses, offices, schools, healthcare, retail and industrial buildings.

Healthcare estates

Sealing programmes delivered around live clinical operations.
Get a Seal Quote
Our Process

How We Deliver

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

UK Fire Stopping Contractor

Nationwide UK Passive Fire Protection Company

Midsummer Fire Protection has established a reputation as a leading passive fire protection company across the UK. Offering our passive fire protection solutions nationwide.

Our head office is based in Kettering, with strategic locations in:
London, Birmingham, Liverpool, and Leeds, meaning we can cover vast areas of the UK, within an hour or two from one of our offices.

Five hubs across England & Wales. Same-day response, FIRAS-certified installers.

Postcode or town name — we'll route you to the closest team.

Standards & Compliance

Sealed to standards that hold up to scrutiny

Intumescent and smoke seals only work if they're matched to the door's tested assembly. We use manufacturer-approved products and document fit per door for the duty holder.
BS 476-22
BS EN 1634-1
BS 8214
Approved Document B
BM Trada Q-Mark
Golden Thread records
Frequently ASked

Intumescent Seal FAQs

What does an intumescent strip actually do?
Intumescent strips expand rapidly under heat to seal the perimeter gap between the door leaf and the frame. That seal stops fire and hot gases passing around the door for the duration of its rating.
What's the difference between an intumescent strip and a smoke seal?
Intumescent strips activate under heat — they perform during a fire. Smoke seals (brush or fin) work cold, stopping smoke movement before fire reaches the door. Many doors require both, often as a single combined seal.
Can painted-over strips still work?
Strips can tolerate one or two thin coats but heavily painted strips often fail to expand correctly. Where overpainting is significant, replacement is the safer specification.
Do you fit strips to the leaf or the frame?
Whichever the door's test evidence specifies. Some assemblies are tested with strips in the leaf, some in the frame, some in both. We always match the test evidence.
How long does a reseal take per door?
A typical single-leaf reseal takes 30 to 45 minutes per door, depending on the existing condition. Portfolio programmes are scheduled to minimise disruption.
Do you supply only, or supply and fit?
Both. We supply manufacturer-matched products to certified installers, or supply and fit as a single accountable package with evidence per door.
Will the work disrupt residents?
Disruption is minimal — a short access window per door, with no mess and no fire watch required.
What evidence do you provide?
Photographic evidence per door, product data sheets, installer certification and an updated asset register entry.
What We fix

Intumescent sealing defects we resolve

These are the recurring intumescent and smoke seal failures we replace and certify across resident and commercial estates.
Painted-over intumescent strips
Missing smoke seals
Cut or trimmed strips
Generic seals outside test evidence
Strips fitted to leaf only when frame is required
Damaged brush smoke seals
Failed drop-down threshold seals
Missing acoustic seals on rated doors
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down