FIRAS & BM Trada Accredited

Fire Door Inspections

Certified fire door inspections, door-by-door defect records, prioritised remedials and Golden Thread-ready evidence for every duty holder.
We inspect fire doors for housing providers, building safety managers and facilities teams across England, with the digital records the regulator and the resident both need.

Talk to a Fire Stopping Expert

Our expert advisors are on hand to answer your questions and discuss your requirements.
Request Callback (Single-Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
Certified installers
Commercial and residential projects
Fire doors and compartmentation
Photo evidence and reporting
Remedial works available
The Risks

A missed defect can mean a missed compartment

Hidden defects fail silently

Painted-over seals, weak closers and out-of-tolerance gaps don't look broken until the moment they need to perform.

Generic reports don't help anyone

Tick-box inspections without door-by-door defect detail can't drive a useful remedial programme.

No evidence trail for the regulator

Under the Building Safety Act and FSE Regs 2022, you have to evidence that inspections happened and that defects were fixed.
What we Inspect

Certified fire door inspections across every industry

Quarterly communal door checks

FSE Regs 2022 quarterly inspections of communal fire doors in HRRBs.

Annual flat entrance door checks

Annual flat entrance door inspections across high-rise residential portfolios.

Full estate baseline surveys

Door-by-door baseline surveys with full defect logs and asset registers.

Post-installation inspections

Independent verification of newly installed door assemblies.

Pre-handover inspections

End-of-project door inspections for developers and main contractors.

Remedial verification

Re-inspection to confirm closure of defects after remedial works.
Get an Inspection Quote
Why It Matters

Inspections are how compliance is evidenced

Under the Fire Safety (England) Regulations 2022 and the Building Safety Act, the duty holder has to show that fire doors are inspected and that defects are managed. Our inspections produce the evidence that satisfies Building Safety Regulators, residents and insurers.
Certified inspectors
Door-by-door defect records
Prioritised remedial schedules
Photographic evidence per defect
Golden Thread-ready outputs
Resident-facing summary letters
WHO WE HELP

Inspection partner for the people who carry the compliance burden

Housing providers

FSE Regs 2022 inspection programmes across HRRBs and general needs stock.

Building safety managers

Evidence packs to support BSR submissions and resident engagement.

Facilities Managers

Annual and biannual inspections across commercial portfolios.

Contractors

Independent pre-handover inspections on new-build and refurb schemes.

Industrial and Commercial Sites

Fire stopping for warehouses, offices, schools, healthcare, retail and industrial buildings.

Estate Managers

Door condition baselines to drive multi-year capital plans.
Get an Inspection Quote
Our Process

How We Deliver

A structured, transparent process from first enquiry to project completion. Every stage is documented and communicated clearly.
01

Enquiry & Review

We review your scope, specification, drawings and programme requirements.

02

Survey & Scope

Detailed site survey to define scope, access, phasing and methodology.

03

Installation

FIRAS-certified operatives deliver works safely and to programme.

04

Handover

Full O&M packs, certificates, photographic records and completion sign-off.

UK Fire Stopping Contractor

Nationwide UK Passive Fire Protection Company

Midsummer Fire Protection has established a reputation as a leading passive fire protection company across the UK. Offering our passive fire protection solutions nationwide.

Our head office is based in Kettering, with strategic locations in:
London, Birmingham, Liverpool, and Leeds, meaning we can cover vast areas of the UK, within an hour or two from one of our offices.

Five hubs across England & Wales. Same-day response, FIRAS-certified installers.

Postcode or town name — we'll route you to the closest team.

Standards & Compliance

Fire door inspections that satisfy the regulator

We inspect to the standards the Building Safety Regulator, Building Control and insurers expect, with the certifications and documentation to prove it.
Certified Inspectors
Fire Safety (England) Regulations 2022
Regulatory Reform (Fire Safety) Order
BS 8214
BM Trada Q-Mark
Golden Thread records
Frequently ASked

Fire Door Inspection FAQs

What is a fire door inspection?
A documented check of a fire door assembly against its tested performance — covering the leaf, frame, ironmongery, seals, gaps, signage and self-closer. We record defects per door with photographic evidence and a prioritised remedial action.
Who is qualified to inspect fire doors?
Fire door inspections should be carried out by a competent person — typically certificated by the Fire Door Inspection Scheme (FDIS) or equivalent third-party scheme. All our inspectors are FDIS certificated.
How often do fire doors need to be inspected?
The Fire Safety (England) Regulations 2022 require quarterly inspections of communal fire doors in high-rise residential buildings and annual checks of flat entrance doors. Other buildings should align to the Regulatory Reform (Fire Safety) Order — typically annually as a minimum.
What does the inspection report include?
A digital report per door covering condition, defects, photographic evidence, prioritised remedial actions and an updated asset register entry.
Can you also fix the defects you find?
Yes. Our certified remedial and maintenance teams can close defects in the same programme, but the inspection itself is delivered independently to keep the evidence credible.
How quickly are reports issued?
Digital reports are issued within 48 hours of the inspection, with the asset register updated alongside.
Are inspections disruptive to residents?
Inspections are quick — typically a few minutes per door — and we coordinate notice, access and resident liaison through your housing or FM team.
Do you offer independent third-party inspection?
Yes. We're often appointed as an independent inspector to verify in-house checks or new installations, providing the assurance the duty holder needs.
What we find

Recurring fire door defects from real inspections

These are the door defects we record most often. Each one is logged, photographed and prioritised in the inspection report.
Excessive perimeter gaps
Self-closers not fully closing
Painted-over intumescent strips
Missing or damaged smoke seals
Doors wedged or held open
Damaged or split door leaves
Non-tested ironmongery combinations
Missing or incorrect signage
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down