












We review your scope, specification, drawings and programme requirements.
Detailed site survey to define scope, access, phasing and methodology.
FIRAS-certified operatives deliver works safely and to programme.
Full O&M packs, certificates, photographic records and completion sign-off.


























In Ealing, effective fire stopping depends on more than simply sealing gaps. It requires a careful approach to the building fabric, from penetrations through walls and floors to the joints, voids and risers where fire can spread unnoticed.
Midsummer Fire Protection installs fire barriers and other passive fire protection measures with reference to the relevant test evidence and manufacturer guidance. That includes work on compartment lines, structural openings and concealed spaces, where detail and consistency are essential.
Whether the project involves remedial upgrades, refurbishment or planned works within an occupied building, the aim is to restore or maintain the fire performance of the structure without unnecessary disruption.
We are also London's most trusted Intumescent Paint Contractor.





