A compartmentation survey checks whether walls, floors, ceilings, service risers and penetrations still provide the fire resistance intended for the building. For commercial landlords, facilities managers and principal contractors, commissioning one before refurbishment works is a sensible way to find fire-stopping gaps early, protect programme certainty and build better compliance evidence.
Refurbishment is where hidden passive fire protection problems often surface. New cable routes, ductwork, pipework, ceiling alterations and tenant fit-out changes can all disturb compartment lines. If those issues are only discovered at handover, the result is usually delay, rework and awkward questions about who owns the evidence.
Compartmentation is the principle of dividing a building into fire-resisting sections so fire and smoke spread can be restricted for a defined period. It relies on the whole system working together: fire-rated walls and floors, protected structural steel, fire doors, dampers and correctly installed fire stopping around every service penetration.
For UK projects, the baseline expectations sit alongside statutory fire safety duties and building regulations guidance, including Approved Document B. Where dutyholders need robust building safety records, the expectations created by the Building Safety Act 2022 and the golden thread guidance have also made evidence quality much harder to treat as an afterthought.
A useful survey is more than a walk-round with a camera. It should identify the intended compartment lines, inspect accessible areas, record defects clearly and explain what remediation is needed. Typical findings include:
The best time is before intrusive refurbishment starts, not after ceilings have been closed and finishes completed. A pre-works survey helps the project team price remedial works properly, coordinate access and avoid clashes between fire stopping, M&E and fit-out packages.
It is particularly valuable before office refurbishments, healthcare or education upgrades, landlord CAT A works, change-of-use projects, plant replacements and any scheme that involves new service routes through compartment walls or floors. Midsummer’s fire stopping contractor support is built around finding these details early and closing them out properly.
Good passive fire protection work should leave a clear trail: what was installed, where it was installed, which system was used and who signed it off. That matters for responsible persons under UK workplace fire safety duties, explained in the government’s fire safety responsibilities guidance, and for anyone who needs to manage future inspection or maintenance.
For contractors, the commercial upside is obvious: better records reduce dispute risk and make handover easier. Our guide to passive fire protection handover packs explains what should be ready before practical completion.
Midsummer Fire Protection supports commercial clients, contractors and building managers with passive fire protection services, including fire stopping, compartmentation remediation and intumescent coating works. If you are planning refurbishment works in London or across the UK, speak to the team before the programme reaches the point where defects become expensive to access.
Not every refurbishment has a named standalone requirement for a compartmentation survey, but building owners and dutyholders must manage fire safety risk. A survey is often the practical way to understand whether existing compartmentation is still effective before works begin.
Use a competent passive fire protection contractor that can match products to tested systems, install them correctly and provide clear records for handover and future maintenance.
Keep location references, before-and-after photographs, product/system information, installer details and sign-off records. This makes later inspections, refurbishments and fire risk reviews much easier.