Latest Insights in Fire Safety & Regulations

Stay informed with expert articles and in-depth guides on the latest fire safety strategies, innovations and regulations.
Article Filtering
  • All
  • Fire Stopping
  • Fire Safety
  • Fire Safety Regulations
  • Fire Doors
  • Intumescent Coatings
Surveyor with a tablet inspecting a service corridor in a commercial building
6 min read

Visual vs Intrusive Compartmentation Surveys: A UK Buyer’s Guide

Understand visual and intrusive compartmentation surveys, define the right scope and compare quotations for your commercial building.
Read article
A construction professional records fire-stopping inspection evidence during an occupied commercial refurbishment
7 min read

Fire Stopping During Occupied Refurbishment: A Practical Guide for Commercial Buildings

Planning refurbishment in an occupied commercial building? Learn how to protect compartmentation, control service penetrations, manage temporary fire precautions and retain reliable fire-stopping evidence.
Read article
Inspector measuring intumescent coating thickness on structural steel

Intumescent Coating Inspection: A Practical UK Checklist for Structural Steel

A practical UK checklist for inspecting intumescent coatings on structural steel, covering design inputs, DFT measurement, application records, defects and handover evidence.
Read article
Site inspection of a protected evacuation lift lobby and shaft during high-rise construction

Evacuation Lift Shafts and Fire Stopping: A 2026 Coordination Checklist

From 30 September 2026, updated Approved Document B guidance changes how evacuation lifts are designed into taller blocks of flats. Use this practical checklist to coordinate shafts, lobbies, compartmentation, penetrations and handover evidence.
Read article
Fire stopping inspection at a commercial construction site before concealed works are closed
6 min read

Fire Stopping Inspection Hold Points: When to Check Work Before It Is Concealed

A practical UK guide to fire stopping inspection hold points, evidence records and pre-handover checks for contractors and commercial building teams.
Read article
Inspector checking intumescent coating thickness on structural steel

Intumescent Coating Inspection Checklist: What to Verify Before Handover

A practical UK checklist for inspecting intumescent coatings on structural steel, covering specification, dry film thickness, defects, records and handover evidence.
Read article
Technician inspecting fire stopping around commercial ductwork and a fire damper
5 min read

Fire Stopping Around Ductwork and Fire Dampers: A Coordination Guide

A practical UK guide to coordinating ductwork, fire dampers and penetration seals at compartment walls and floors—covering design, access, installation evidence and handover checks.
Read article
9 min read

What Is Fire Stopping in Construction?

Fire stopping is the process of sealing openings, joints and gaps in fire-resisting walls and floors so that fire and...
Read article
Technician documenting cable penetrations during a commercial fire-stopping project
10 min read

Fire Stopping for Cable and Data Upgrades in Commercial Buildings

Planning cable, fibre or data upgrades in an occupied commercial building? Use this practical guide to protect compartmentation, control penetrations and retain clear fire-stopping evidence.
Read article
Fire protection and M&E specialists coordinating service penetrations in a commercial building
14 min read

Fire Stopping Design Coordination: A Pre-Installation Checklist for M&E Contractors

A practical UK pre-installation checklist for coordinating M&E services, compartment lines, tested fire-stopping systems and evidence before work begins.
Read article
Construction specialists reviewing passive fire protection around a high-rise stair core

Approved Document B 2026: Second Staircase Checklist

Preparing for the Approved Document B changes taking effect on 30 September 2026? Use this practical checklist to coordinate compartmentation, fire stopping, service penetrations and compliance evidence.
Read article
A passive fire protection inspection around service penetrations in a commercial building
6 min read

Permit to Penetrate: How to Control Fire Stopping During Commercial Building Works

A practical UK guide to permit-to-penetrate controls for service penetrations, helping property teams protect compartmentation and retain reliable fire-stopping evidence.
Read article
Fire stopping around commercial service penetrations being recorded before ceiling closure
6 min read

Fire Stopping for Service Penetrations: What to Record Before Ceilings Close

A practical UK guide for contractors, facilities managers and commercial property teams on checking and recording fire-stopping around service penetrations before access is lost.
Read article
Commercial passive fire protection inspection showing compartmentation and fire-stopping evidence during refurbishment works.
3 min read

Compartmentation Surveys: What Commercial Building Managers Should Check Before Refurbishment Works

A practical UK guide to compartmentation surveys before commercial refurbishment works, covering fire stopping, evidence records, dutyholder expectations and when to bring in a passive fire protection specialist.
Read article
Passive fire protection evidence being recorded during commercial construction works
4 min read

Passive Fire Protection Handover Packs: What Contractors Should Have Ready Before Practical Completion

A practical UK guide to passive fire protection handover packs: what evidence contractors and property teams should collect before practical completion to support compliance, golden thread records and future maintenance.
Read article
1 2 3 … 7
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down