Latest Insights in Fire Safety & Regulations

Stay informed with expert articles and in-depth guides on the latest fire safety strategies, innovations and regulations.
Article Filtering
  • All
  • Fire Safety
  • Fire Stopping
  • Fire Doors
  • Fire Safety Regulations
  • Intumescent Coatings
9 min read

What Is Fire Stopping in Construction?

Fire stopping is the process of sealing openings, joints and gaps in fire-resisting walls and floors so that fire and...
Read article
Technician documenting cable penetrations during a commercial fire-stopping project
10 min read

Fire Stopping for Cable and Data Upgrades in Commercial Buildings

Planning cable, fibre or data upgrades in an occupied commercial building? Use this practical guide to protect compartmentation, control penetrations and retain clear fire-stopping evidence.
Read article
Fire protection and M&E specialists coordinating service penetrations in a commercial building
14 min read

Fire Stopping Design Coordination: A Pre-Installation Checklist for M&E Contractors

A practical UK pre-installation checklist for coordinating M&E services, compartment lines, tested fire-stopping systems and evidence before work begins.
Read article
Construction specialists reviewing passive fire protection around a high-rise stair core

Approved Document B 2026: Second Staircase Checklist

Preparing for the Approved Document B changes taking effect on 30 September 2026? Use this practical checklist to coordinate compartmentation, fire stopping, service penetrations and compliance evidence.
Read article
A passive fire protection inspection around service penetrations in a commercial building
6 min read

Permit to Penetrate: How to Control Fire Stopping During Commercial Building Works

A practical UK guide to permit-to-penetrate controls for service penetrations, helping property teams protect compartmentation and retain reliable fire-stopping evidence.
Read article
Fire stopping around commercial service penetrations being recorded before ceiling closure
6 min read

Fire Stopping for Service Penetrations: What to Record Before Ceilings Close

A practical UK guide for contractors, facilities managers and commercial property teams on checking and recording fire-stopping around service penetrations before access is lost.
Read article
Commercial passive fire protection inspection showing compartmentation and fire-stopping evidence during refurbishment works.
3 min read

Compartmentation Surveys: What Commercial Building Managers Should Check Before Refurbishment Works

A practical UK guide to compartmentation surveys before commercial refurbishment works, covering fire stopping, evidence records, dutyholder expectations and when to bring in a passive fire protection specialist.
Read article
Passive fire protection evidence being recorded during commercial construction works
4 min read

Passive Fire Protection Handover Packs: What Contractors Should Have Ready Before Practical Completion

A practical UK guide to passive fire protection handover packs: what evidence contractors and property teams should collect before practical completion to support compliance, golden thread records and future maintenance.
Read article
Commercial fire stopping evidence being recorded during a UK fit-out inspection
5 min read

Fire Stopping Records for Fit-Outs: What Property Teams Should Keep

A practical UK guide for property managers, contractors and facilities teams on the fire stopping records to keep after fit-outs, refurbishments and service changes.
Read article
Fire stopping inspection evidence being recorded during a commercial fit-out handover.
5 min read

Fire Stopping Maintenance After Tenant Fit-Outs: A Practical Guide for Commercial Property Teams

Commercial tenant fit-outs can compromise compartmentation if fire stopping is not checked, recorded and remediated. This guide explains what property teams should inspect, document and hand over after refurbishment works.
Read article
Commercial fire stopping inspection after refurbishment works
7 min read

Fire Stopping After Refurbishment: What Commercial Property Teams Should Check

Fire stopping should be checked after refurbishment, fit-out or service alterations. Use this commercial property checklist to inspect compartmentation, service penetrations, fire doors, evidence packs and remedial works before handover.
Read article
Off-site intumescent coating inspection on structural steel

Off-Site Intumescent Coatings: Why Earlier Steel Protection Can Reduce Site Risk

Off-site intumescent coatings can help contractors protect structural steel earlier, reduce programme pressure on site and improve passive fire protection records.
Read article
Fire stopping inspection evidence being recorded around service penetrations
3 min read

Fire Stopping Evidence Packs: What Building Managers Should Keep on Record

A practical guide to the fire stopping evidence building managers, contractors and dutyholders should retain for compartmentation, compliance and golden thread records.
Read article
8 min read

Cavity barrier installation in external walls: common mistakes and early warning signs

Cavity barriers are fire and smoke stopping measures fitted within external wall cavities. You will typically find them behind rainscreen...
Read article

Golden Thread Building Safety Act: Practical Steps for Property Managers

What the Golden Thread means The golden thread is GOV.UK and Building Safety Regulator language for keeping accurate, properly controlled...
Read article
1 2 3 … 6
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down