Latest Insights in Fire Safety & Regulations

Stay informed with expert articles and in-depth guides on the latest fire safety strategies, innovations and regulations.
Article Filtering
  • All
  • Fire Stopping
  • Fire Safety
  • Fire Safety Regulations
  • Fire Doors
  • Intumescent Coatings
7 min read

Fire Door Inspections: What to Expect

Fire doors are a key element in maintaining fire safety within buildings. They are designed to contain the spread of...
Read article
4 min read

5 Fire Safety Mistakes Businesses Make (And How To Avoid Them)

Fire safety is a fundamental aspect of running a business, no matter the industry or size. Ensuring that your workplace...
Read article
6 min read

How Human Behaviour Can Impact Fire Emergency Procedures

Effective fire emergency procedures are essential for safeguarding lives and property. In the event of a fire, the ability to...
Read article
7 min read

Fire Safety True or False: Fire Doors

Fire doors play a crucial role in controlling the spread of fire, protecting lives, and safeguarding property. They’re an essential...
Read article

A Guide to Fire Compartmentation Surveys

Fire compartmentation is a critical component of passive fire protection, designed to limit the spread of fire and smoke within...
Read article
7 min read

Do Fire Door Handles Need To Be Fire-rated?

Fire doors are a crucial component of passive fire protection within any building, serving as a first line of defence...
Read article
6 min read

What is a Fire Batt?

When considering building safety, passive fire protection plays a crucial role in safeguarding lives and property. Unlike active fire protection...
Read article
8 min read

Carrying Out Fire Risk Assessments in Flats and Apartments

Ensuring the safety of residents in flats and apartments is the responsibility of property owners and managers. Fire risk assessments...
Read article
6 min read

What Are Fire Dampers and How Do They Work?

Fire safety is critical in building design and maintenance, ensuring the protection of both occupants and property. Effective fire protection...
Read article

Ensuring Compliance with Fire Protection and Building Regulations for Steel Structures

In construction and building management, the fire safety of steel-framed structures is a regulatory requirement and a critical safeguard. Steel,...
Read article
8 min read

Fire Stopping Between Floors

Fire stopping is a critical component of building safety, designed to contain and slow the spread of fire and smoke...
Read article
9 min read

Types of Fire Doors: A Comprehensive Guide

Fire safety is a critical aspect of building design and maintenance, aimed at protecting lives and property from the devastating...
Read article
5 min read

How Does Intumescent Paint Work?

Fire safety is a critical aspect of building design and construction, aimed at protecting lives and property. One essential component...
Read article
8 min read

Intumescent Coatings vs. Traditional Fireproofing Methods

Fireproofing and fire stopping are crucial aspects of building safety, aimed at protecting the structural integrity of buildings during a...
Read article
8 min read

What is Intumescent Paint for Steel?

Intumescent paint is a specialised coating used to provide passive fire protection to steel structures. It is designed to expand...
Read article
Get Started

Let's Discuss Your Fire Stopping Requirements

For enquiries, tenders or questions, please call our Head Office on 01536 211999 or contact our team via the enquiry form.

Why Choose Midsummer Fire Protection?

Friendly and professional
Accurate & expert guidance
No obligation quotes
Effective and trusted solutions
“A company renowned for workmanship, professionalism, and high quality. We aspire to exceed your expectations, on time, in time, every time”

Don’t Leave Your Fire Safety to Chance. Tell Us How We Can Help.

Our expert team are on hand to answer your questions or arrange a quotation for your requirements.
Enquiry Section (Single Col)
info@midsummerfirepro.co.uk · Free quote · Response within 24hrs
FIRAS & BMTRADA Certified | Nationwide | 1,000+ Sites
starenvelopephone-handsetchevron-down