Latest Insights in Fire Safety & Regulations

Stay informed with expert articles and in-depth guides on the latest fire safety strategies, innovations and regulations.

Filter Articles

Article Filtering
  • All
  • Fire Safety
  • Fire Stopping
  • Fire Doors
  • Fire Safety Regulations

A Guide to Emergency Light Regulations

Emergency lighting is a crucial safety feature designed to activate automatically during a power outage, providing illumination to facilitate safe...
7 minute read
13th January 2025

Ensuring Fire Safety in High-Rise Developments: Key Considerations and Compliance Strategies

Fire safety is a critical consideration in high-rise buildings. With their towering structures and dense populations, these developments pose unique...
10 minute read
23rd December 2024
Fire classes: Class F cooking oils and fats fire in a kitchen

Post-Fire Recovery: Steps to Take After a Fire Incident

Experiencing a fire can be one of the most devastating events in life. It can leave you feeling overwhelmed, unsure...
7 minute read
16th December 2024

Understanding Fire Load

Fire load is a term used in fire safety to describe how much fuel is in a space. It refers...
6 minute read
9th December 2024

Fire Safety in Timber Construction

Timber has seen a remarkable resurgence in modern construction, celebrated for its sustainability, natural aesthetic, and versatility. As a renewable...
6 minute read
2nd December 2024

5 Common Fire Door Fitting Mistakes and How To Avoid Them

Ever wondered if your fire doors are really doing their job? It’s one of those things we don’t think about...
5 minute read
22nd November 2024

Selecting The Appropriate Lock For Your Fire Door

Imagine you’re in a hotel, and the fire alarm goes off. You instinctively head for the fire exit, expecting everything...
5 minute read
15th November 2024

Utilising Fire Curtains in High-Rise Buildings

If you’ve never heard of them before, don’t worry—you’re not alone! Fire curtains are like invisible shields that drop down...
8 minute read
8th November 2024

Emergency Lighting: Why It’s More Than Just Exit Signs

Emergency lighting isn’t just about glowing green exit signs. It’s a life-saving system that kicks in when the power goes...
6 minute read
1st November 2024

The Differences Between Fire Doors and Emergency Exits

In any building, fire safety doors are crucial in protecting occupants and property. While fire doors and emergency exits are...
5 minute read
25th October 2024

The Most Common Failures of Compartmentation: Residential Buildings

Fire compartmentation is a crucial safety measure in any building. It involves dividing spaces into “compartments” that act as barriers...
4 minute read
18th October 2024

What are Penetration Seals in Fire Safety?

Penetration seals are a critical component of passive fire protection systems, designed to prevent the spread of fire and smoke...
5 minute read
11th October 2024
1 2 3 6
chevron-down